Wellpoints
Pipes with a filter tip, jetted into the ground along the excavation. As standard: 32 mm wellpoints 7 m long (30 or 60 cm filter mesh) and 50 mm wellpoints 4, 5 or 6 m long (1 m perforated section). How many you need and how closely they are spaced depends on the ground and the length of the section.







